ASI #3, Loading Dock Stair Clarification, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #4, Ceiling/Lighting Coordination, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #5, Foundation Drain on SW and South Sides Taken to ARB Foundation Drain, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #6, Structural Coordination and Miscellaneous Clarifications, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #7, Miscellaneous Clarifications, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #8, Response to Bldg. Dept, Fiberglass for Runouts, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #9, Plumbing Clarifications (Sheets P3.02, P3.04, P6.01, P8.03) 1/15/06, 2006
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #10, Exhaust Fan Inlet Bypass, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #11, Relocation of Stairs and Handicapped Parking, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #12, Coping, Light Door Perforations, Flooring Doors Walls, Sink, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.