Box 22
Contains 24 Results:
EKA/PHIPPS Proposal to Lower Watermain, Change Animal Room Ceilings, Remove Emergency Wad bank, Give Cash, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
GSA Stand on E/K PHIPPS Issues- Remanufactured Sterilizer (In Cage Wash) 7 Items Outside the ISRB Parcel Boundaries, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #1, Retaining Wall Near Communication Pedestal, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
ASI #2, Revised Door Hardware Specification Section 08710, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.