Box 11
Contains 25 Results:
Door Hardware Specs Not Included In 100% Final CD Drawings & Specs, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
List of Hazardous Materials to Be Stored In the Building, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Vending Machine Space, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
IT Duct Bank Location to WSB and WDRB, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Water in WSB T/C Manhole, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Move Stop Sign, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Proposal for Pre-Manufacture Cubicles, PCO #4, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Potential Change Order For Auto Gate Relocation (FPS Security) (PCO #6)- RESTRICTED, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Stainless Steel jacketing On Rack Washer, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.
Potential Problem with “Low” Concrete Breaks, n.d.
The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.
This series contains restricted material.