Box 8
Contains 17 Results:
ISRB-“Lab Animal” Special Issue on “Facility Design & Planning”, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Architectural Rendering, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Pre-Final Submission, 10/3/2002, 2002
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Draft Final Submission, 3/5/2004, 2004
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Draft Final 35% Technical Specifications 3/5/2004 with W.E.D. Comments 15010 16741, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
GSA Portion of SFO for Phase Two Bidding, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
GSA Revisions to SFO April/May 2004, 2004
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.