Box 6
Contains 24 Results:
Schedule for HVAC Services to Areas, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Pressure Washer for Shipping/Receiving, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
SFO Modification-Need Elevations between ARBSW & Bldg. 8, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Future Security System Costs-ISRB, WDRB, ARB Wings, Network Conversion, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Security Meeting with Ken Miller 7/16/03, 2003
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Security System Funding-APHIS or Developer, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
CCTV Camera Locations- RESTRICTED, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Contractor Penalty Charges (Late) in SFO, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
WS Directive-“Invasive Species Damage Management”, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
OZ SFO Update Proposal, 2003
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.