Box 1
Contains 13 Results:
Cage/Cage Rack Needs-Animal Module Design, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Invasive Species Exec. Order, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.
Written Procedures for ARB Operation, n.d.
The Pre-Construction series was received in 2004 and contains all documents pertaining to the planning of the Invasive Species Research Building. It includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
This series contains restricted material.