Skip to main content

Shortcomings of the Building/Process, n.d.

 File — Box: 31, Folder: 3

Scope and Contents

From the Series:

The second series, Construction, arrived in pieces starting in 2005 and ending in 2007. It contains all documents pertaining to the actual construction process of the Invasive Species Research Building, such as blueprints, construction schedules, and changes to the original design plan.

This series contains restricted material.

Dates

  • n.d.

Extent

From the Collection: 26.3 linear feet

Language of Materials

From the Collection: English

Repository Details

Part of the National Wildlife Research Center Archives Repository

Contact:
4101 LaPorte Ave
Fort Collins CO 80521 USA
970-266-6021