Travel for Alternative Dispute Resolution, April 27-29, Lakewood CO, n.d.
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.
Mediation Settlement Between GSA and CJCC -$500K – 4/29/08, 2008
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.
Preparation of Mediation Statement for Arbitration Hearing (ADR), n.d.
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.
ACQUEST Claim vs GSA – Exhibit 32, n.d.
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.