Box 44
Contains 14 Results:
ACQUEST 15 PCO’s for $700K, 4/10/03, 2003
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.
ACQUEST PCO Claim 4/28/03-$900k, 2003
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.
ACQUEST Dispute Claim-$732k, n.d.
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.
Punch Lists Status, Left to Do, n.d.
The second series, Construction, arrived in 2003 and contains all documents pertaining to the actual construction process of the Outdoor Pens and associated buildings, such as blueprints, construction schedules, and changes to the original design plan. These documents cover the period of 2001-2004.