Box 12
Contains 8 Results:
OPP/ARBSW-Security System Contracting & Documents have GSA & Developer Do It-RSTRCT, n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
OPP/ARBSW-Security System-BJY Docs., n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
MP/OPP/ARBSW/APHIS Finance Security System & Own-OPP ADD Alternate- RESTRICTED, n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
OPP/ARBSW-Need CSU Written Approval for Construction, n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
CSU Contingencies in Approval Letter (surface runoff, sewage disposal), n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
Developer/Contractor Questions, n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
MP/SS-CSU Detection of Possible Survey Mistake, n.d.
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
Site and Parcel Survey Discrepancy-CSU May 2001, 2001
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.