Box 3
Container
Contains 13 Results:
Colored Sketch of Southeast Elevation, April – July 2009, 2009
File — Box: 3, Folder: 11
Scope and Contents
From the Series:
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
Dates:
2009
Phase 1 SFO (6/25/09), Amend. #1 (7/8/09) Folder #1, 2009
File — Box: 3, Folder: 12
Scope and Contents
From the Series:
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
Dates:
2009
Phase 1 SFO (6/25/09), Amend. #1 (7/8/09) Folder #2, 2009
File — Box: 3, Folder: 13
Scope and Contents
From the Series:
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
Dates:
2009