Box 1
Contains 77 Results:
SFO Schedule and Deliverables, 5/4/09-8/2/09, 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
NWRC Comments on Draft SFO Appendices A-N Dated 17 July, 2009; 10 Aug 2009, 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
NWRC Comments on Final Draft SFO Text Issued 17 July 2009 (Not Incl. Appendices), 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
NWRC Comments on Final Draft Drawings Issued 17July 2009, 10 Aug 2009; Provided 7/29/09, 8/1/09, 8/2/09, 8/18/09, 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
OMB Stops all “Built-To-Suit” GSA Projects; WDRB Released 8/21/09, 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
7/2/09, 07/7/09 Query from USDA via APHIS/BPA (Bob Landberg) Concerning WDRB Status, 7/2/09, 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.
First Draft of Final SFO Dated 8/10/09; Received 8/11/09 (1 of 2), 2009
This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.