Skip to main content

Box 1

 Container

Contains 77 Results:

SFO Schedule and Deliverables, 5/4/09-8/2/09, 2009

 File — Box: 1, Folder: 68
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

NWRC Comments on Draft SFO Appendices A-N Dated 17 July, 2009; 10 Aug 2009, 2009

 File — Box: 1, Folder: 69
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

NWRC Comments on Final Draft SFO Text Issued 17 July 2009 (Not Incl. Appendices), 2009

 File — Box: 1, Folder: 70
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

NWRC Comments on Final Draft Drawings Issued 17July 2009, 10 Aug 2009; Provided 7/29/09, 8/1/09, 8/2/09, 8/18/09, 2009

 File — Box: 1, Folder: 71
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

OMB Stops all “Built-To-Suit” GSA Projects; WDRB Released 8/21/09, 2009

 File — Box: 1, Folder: 72
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

7/2/09, 07/7/09 Query from USDA via APHIS/BPA (Bob Landberg) Concerning WDRB Status, 7/2/09, 2009

 File — Box: 1, Folder: 73
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

First Draft of Final SFO Dated 8/10/09; Received 8/11/09 (1 of 2), 2009

 File — Box: 1, Folder: 74
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009