CO2 Incubator, Single Chamber, Nuaire NU-8500 (IN2), 8/09, 2009

 File — Box: 1, Folder: 61
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Ice Maker, Scotsman NME1254 (IM2), 8/09, 2009

 File — Box: 1, Folder: 62
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Biological Safety Cabinet, Class II B1, Nuarie Labgard 427 (BC1) 8/09, 2009

 File — Box: 1, Folder: 63
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Ultra Low Freezer (-20), Revco Ult-1740-9A (FZ2), 8/09, 2009

 File — Box: 1, Folder: 64
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Flammable Storage Cabinet, Securall A131-30 (FC), 8/09, 2009

 File — Box: 1, Folder: 65
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Biological Safety Cabinet, Mobile, Class II A2, Nuaire Labgard NU-629-600 (BC4), 2009

 File — Box: 1, Folder: 66
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Video Camera (RC)- Pelco SD4TC-PREO, 8/09, 2009

 File — Box: 1, Folder: 67
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

SFO Schedule and Deliverables, 5/4/09-8/2/09, 2009

 File — Box: 1, Folder: 68
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

NWRC Comments on Draft SFO Appendices A-N Dated 17 July, 2009; 10 Aug 2009, 2009

 File — Box: 1, Folder: 69
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

NWRC Comments on Final Draft SFO Text Issued 17 July 2009 (Not Incl. Appendices), 2009