Skip to main content

Box 1

 Container

Contains 77 Results:

Biological Safety Cabinet, Class III, Nuaire Labgard 704 (BC3), 8/09, 2009

 File — Box: 1, Folder: 58
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Refrigerator/Freezer, Upright, Revco RCRF112A, 2009

 File — Box: 1, Folder: 59
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Ultra Low Freezer (-80) Revco ULT-1386-9A (FZ1), 8/09, 2009

 File — Box: 1, Folder: 60
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

CO2 Incubator, Single Chamber, Nuaire NU-8500 (IN2), 8/09, 2009

 File — Box: 1, Folder: 61
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Ice Maker, Scotsman NME1254 (IM2), 8/09, 2009

 File — Box: 1, Folder: 62
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Biological Safety Cabinet, Class II B1, Nuarie Labgard 427 (BC1) 8/09, 2009

 File — Box: 1, Folder: 63
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Ultra Low Freezer (-20), Revco Ult-1740-9A (FZ2), 8/09, 2009

 File — Box: 1, Folder: 64
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Flammable Storage Cabinet, Securall A131-30 (FC), 8/09, 2009

 File — Box: 1, Folder: 65
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Biological Safety Cabinet, Mobile, Class II A2, Nuaire Labgard NU-629-600 (BC4), 2009

 File — Box: 1, Folder: 66
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Video Camera (RC)- Pelco SD4TC-PREO, 8/09, 2009

 File — Box: 1, Folder: 67
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009