Security Device Locations and Summary (Graphics and Text) SFO Appendices G& H, n.d.

 File — Box: 1, Folder: 11
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: n.d.

Phone Set and Extensions Spreadsheet, SFO Appendix I, 8/09, 2009

 File — Box: 1, Folder: 12
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Intercom System Graphics, Tech. Specs., & Location Spreadsheet, SFO Appendix J, 8/09, 2009

 File — Box: 1, Folder: 13
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Commissioning Matrix (SFO Appendix K) 8/09, 2009

 File — Box: 1, Folder: 14
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Master Site Plan Graphic, SFO Appendix L, 8/09, 2009

 File — Box: 1, Folder: 15
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Animal Room Remote Video Monitoring System, SFO Appendix M, 8/09, 2009

 File — Box: 1, Folder: 16
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

OZ Release Agreement, SFO Appendix N, 7/17/09, 2009

 File — Box: 1, Folder: 17
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Add Alternate 1, Elevator, SFO Appendix O 8/3/09, 2009

 File — Box: 1, Folder: 18
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Add Alternate 2, Bulk Sterilizer, SFO Appendix P, 8/3/09, 2009

 File — Box: 1, Folder: 19
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Add Alternate 3, Tunnel Washer, SFO Appendix Q, 8/3/09, 2009

 File — Box: 1, Folder: 20
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.