GSA RWA Folder #1, 9/5/03-9/28/06, 2006

 File — Box: 1, Folder: 1
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2006

GSA RWA Folder #2, 2/7/07-3/26/08, 2008

 File — Box: 1, Folder: 2
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2008

GSA RWA Folder #3, 4/1/08-7-29-08, 2008

 File — Box: 1, Folder: 3
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2008

GSA RWA Folder #4, 8/11/08-4/29/09, 2009

 File — Box: 1, Folder: 4
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

GSA RWA Folder #5, 4/30/09-August 09, 2009

 File — Box: 1, Folder: 5
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

WDRB Location and extent Review with Larimer County, SFO Appendix A, 8/09, 2009

 File — Box: 1, Folder: 6
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Keying schedule and Key Database, SFO Appendices B and C, 8/09, 2009

 File — Box: 1, Folder: 7
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Room Signage Spreadsheet, SFO Appendix D, 8/09, 2009

 File — Box: 1, Folder: 8
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Equipment Schedule, SFO Appendix E, 8/09, 2009

 File — Box: 1, Folder: 9
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.

Dates: 2009

Systems Furniture Layout and Quote – Herman Miller SFO Appendix F, 8/09, 2009

 File — Box: 1, Folder: 10
Scope and Contents From the Series:

This series lists many of the mechanical devices and fixtures to be added to the building as well as the Phase I SOFs for the reduced building. It is 2.75 Linear Feet.