Description of the Ames BSL-3 Ag Lab, April, 2007, 2007

 File — Box: 9, Folder: 51
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Executive Order 1/9/2009, “Strengthening Laboratory Biosecurity in the U.S.”, 2009

 File — Box: 9, Folder: 52
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Ten “Lessons Learned,” Ideas for a Successful Biocontainment Facility, undated, n.d.

 File — Box: 9, Folder: 53
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

“Uncovering Weakness of Biocontainment Facilities”, 6/20/2006, Tradeline, Tony Della-Porta, 2006

 File — Box: 9, Folder: 54
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2006

ADA Requirements in Biocontainment, 9/17/2008, 2008

 File — Box: 9, Folder: 55
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Estimating NWRC Costs to Run and Maintain the Building, 6/2/2008, 2008

 File — Box: 9, Folder: 56
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

May 2008, NWRC Overview to CSU (Ralph Smith), CSU Recruiting ARS Laramie to Move to CSU

 File — Box: 9, Folder: 57
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007 - 2009

Architect’s Rendering, 2009, 2009

 File — Box: 9, Folder: 58
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

WDRB Fact Sheets, 8/31/2009, 2009

 File — Box: 9, Folder: 59
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Site Location Photos, 2006, 2006

 File — Box: 9, Folder: 60
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.