Skip to main content

Box 9

 Container

Contains 62 Results:

SFO Section 15411, Water Distribution Piping, 4/22/09, 2009

 File — Box: 9, Folder: 31
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 15440, Plumbing Fixtures and Trim, 4/23/09, 2009

 File — Box: 9, Folder: 32
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 15888, Air Cleaning, 4/23/09, 2009

 File — Box: 9, Folder: 33
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 15890, Ductwork, 4/23/09, 2009

 File — Box: 9, Folder: 34
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 15930, Air Terminal Units, 4/23/09, 2009

 File — Box: 9, Folder: 35
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 15971, Controls and Instrumentation, n.d.

 File — Box: 9, Folder: 36
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

SFO Section 15975, Sequence of Operation, 4/23/09, 2009

 File — Box: 9, Folder: 37
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section, 15990, Testing, Adjusting, and Balancing, n.d.

 File — Box: 9, Folder: 38
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

SFO Sections 15040, 15421, 15250, 15300, 15310, 15420, 15450, 15488, 15510, 15540, 15560, 15570, 15575, 15585, 15684, 15711, 15712, 15755, 15810, 15851,15885, 15910, 15920, 15940, 4/23/09, 2009

 File — Box: 9, Folder: 39
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 15995, Mechanical Commissioning, 4/23/09, 2009

 File — Box: 9, Folder: 40
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009