Box 9

 Container

Contains 62 Results:

SFO Drawings, 09/07/2007, 2007

 File — Box: 9, Folder: 1
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Complete SFO Written Document, 09/07/2007 (1 of 2), 2007

 File — Box: 9, Folder: 2
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Complete SFO Written Document, 09/07/2007 (2 of 2), 2007

 File — Box: 9, Folder: 3
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Room Elevations, A7.01, A7.02, A8.01, A8.02, Building Sections A3.01, Wall Sections A4.02, May 2009, 2009

 File — Box: 9, Folder: 4
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Landscape Design, April – May, 2009, 2009

 File — Box: 9, Folder: 5
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Intercom Meeting with Commend, 5/20/09, 2009

 File — Box: 9, Folder: 6
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 11, Technical Specifications, 5/7-13/2009, 2009

 File — Box: 9, Folder: 7
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

GSA Notifies Interested Parties of Upcoming Re-advertisement, 5/21/09, 2009

 File — Box: 9, Folder: 8
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Section 10, Design Requirements, 5/7/09, 2009

 File — Box: 9, Folder: 9
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Duplex and Quad Data Outlet Locations, March – April, 2009, 2009

 File — Box: 9, Folder: 10
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009