Box 8

 Container

Contains 64 Results:

Moveable Fence Barriers for General Corridor, 7/13/2009, 2009

 File — Box: 8, Folder: 46
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Surface Drainage, Sheets C1, C3, C4, AO.07, L-1, 6/4/2009, 2009

 File — Box: 8, Folder: 48
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Interior Animal Room Fencing for Deer and Feral Swine, 02-05/2009, 2009

 File — Box: 8, Folder: 53
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Knoll Systems Furniture Inquiry, 5/28/2009, 2009

 File — Box: 8, Folder: 54
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

OZ Submittal of Draft SFO, 5/28/09, 2009

 File — Box: 8, Folder: 55
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

NRWC Comments on 5/28/09 Draft SFO Drawings, n.d.

 File — Box: 8, Folder: 56
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

SFO Drawings, 5/28/2009, 2009

 File — Box: 8, Folder: 57
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Phase Two SFO Written Document, 5/28/2009, 2009

 File — Box: 8, Folder: 58
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

SFO Drawings, 10/24/2008, 2008

 File — Box: 8, Folder: 59
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Complete SFO 9/7/07 (Clean Copy) (1 of 2)

 File — Box: 8, Folder: 60
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007 - 2009