Box 8

 Container

Contains 64 Results:

Necropsy Table Specifications, February, 2009, 2009

 File — Box: 8, Folder: 31
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Drug Safe, Sentry Safe DA3750 (DS), Fall, 2008, 2008

 File — Box: 8, Folder: 32
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Tunnel Washer, Scientek SW 2536 (TW), Fall, 2008, 2008

 File — Box: 8, Folder: 33
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

SFO Section 16741, Telephone and Data Systems, 10/6/08 – 3/9/09, 2009

 File — Box: 8, Folder: 34
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Phone Set and Extension Spreadsheet and Location Depictions, 9/24/08 – 3/5/09, 2009

 File — Box: 8, Folder: 35
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

GSA’s Proposed Board of Governors (CSU) Resolution Related to Sole Source, 9/18/08 – 10/28/08, 2008

 File — Box: 8, Folder: 36
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Draft SFO Comments – Technical Specifications –Sections 15000-16000, (Not Incl. 16727 and 16741), June, 2009, 2009

 File — Box: 8, Folder: 41
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Draft SFO Comments, Cover, Table of Contents, Section 9, Section 10, 6/8/09, 2009

 File — Box: 8, Folder: 43
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

3D Modeling Specification and Requirement, July 2009, 2009

 File — Box: 8, Folder: 44
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Monolithic Concrete Pour at Animal Room Wall Corners, 7/15/2009, 2009

 File — Box: 8, Folder: 47
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009