Box 8

 Container

Contains 64 Results:

Necropsy Table Specifications, February, 2009, 2009

 File — Box: 8, Folder: 31
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Drug Safe, Sentry Safe DA3750 (DS), Fall, 2008, 2008

 File — Box: 8, Folder: 32
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Tunnel Washer, Scientek SW 2536 (TW), Fall, 2008, 2008

 File — Box: 8, Folder: 33
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

SFO Section 16741, Telephone and Data Systems, 10/6/08 – 3/9/09, 2009

 File — Box: 8, Folder: 34
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Phone Set and Extension Spreadsheet and Location Depictions, 9/24/08 – 3/5/09, 2009

 File — Box: 8, Folder: 35
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

GSA’s Proposed Board of Governors (CSU) Resolution Related to Sole Source, 9/18/08 – 10/28/08, 2008

 File — Box: 8, Folder: 36
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Draft SFO Provided to CSU, 11/5/08, 2008

 File — Box: 8, Folder: 37
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Items to Address For a Joint NWRC/CSU Building, 9/9/08 – 12/3/08, 2008

 File — Box: 8, Folder: 38
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Specification Section 1674 – Telephone and Data Systems, March – June, 2009, 2009

 File — Box: 8, Folder: 39
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

NWRC Comments, Section 15440, Plumbing Fixtures and Trim, 6/17/09, 6/23/09; 15010, General Provisions (Mech.), 6/23/09, 2009

 File — Box: 8, Folder: 40
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.