Box 7

 Container

Contains 55 Results:

Security Device Summary, n.d.

 File — Box: 7, Folder: 51
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Systems Furniture, n.d.

 File — Box: 7, Folder: 52
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Comments on Technical Specs (Sections 9, 10, and 11.1-11.4), November 2008 – March 2009, 2008 - 2009

 File — Box: 7, Folder: 53
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008 - 2009

Herman Miller Systems Furniture Layout, Fall, 2008, 2008

 File — Box: 7, Folder: 54
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

OZ Proposal for Redesign ($213,000.00), 7/14/2008-, 2008

 File — Box: 7, Folder: 55
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008