Skip to main content

Box 7

 Container

Contains 55 Results:

OZ Email Problem, June 2008, 2008

 File — Box: 7, Folder: 41
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

GSA Cancels the Initial Solicitation, 6/5/08, CSU May Increase Fees, 2008

 File — Box: 7, Folder: 42
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

NWRC Staff Announcement of “No Award,” 5/28/08, 2008

 File — Box: 7, Folder: 43
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Univ. of Colorado Report on Federal Labs in CO; NPR Report, 5/22/08; Coloradoan, 6/17/08, 2008

 File — Box: 7, Folder: 44
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Final Architect’s Government Cost Estimate and Potential Cost Savings, Fall 2007, 2007

 File — Box: 7, Folder: 45
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Keying Schedule and Keying System Description – SFA Appendix A (Spreadsheet), n.d.

 File — Box: 7, Folder: 46
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Interior Room Signage Schedule (Spreadsheet) – SFO Appendix B., n.d.

 File — Box: 7, Folder: 47
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Phone Set and Extension Database (Spreadsheet), n.d.

 File — Box: 7, Folder: 48
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Oxford Query- Provide 3 USDA Company References for Security System Work, October, 2007, 2007

 File — Box: 7, Folder: 49
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Security Device Locations, n.d.

 File — Box: 7, Folder: 50
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.