Box 7

 Container

Contains 55 Results:

Redesign Kickoff Meeting, n.d.

 File — Box: 7, Folder: 31
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Emails to Liz Yo of OZ on 7/16/08 to Start Redesign, 2008

 File — Box: 7, Folder: 32
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

GSA Market Research – Work Performed in BSL-3 and BSL-3 Ag and Risks, n.d.

 File — Box: 7, Folder: 33
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Ideas for Reducing Owner/Developer Risk, n.d.

 File — Box: 7, Folder: 34
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Interstitial Access Between WDRB and ARB (If No WDRB Elevator), n.d.

 File — Box: 7, Folder: 35
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Pre-Proposal Conference for OZ, 6/11/08, 2008

 File — Box: 7, Folder: 36
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

WS Decision to Start New Procurement with GSA, May 14, 2008, 2008

 File — Box: 7, Folder: 37
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Permission from Oxford Dev. to Use Negotiation Design Ideas in Govt. Redesign, n.d.

 File — Box: 7, Folder: 38
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

SFO Security, Phone, and Data Tech. Specs. to Tony Perretta, 6/23/08, 2008

 File — Box: 7, Folder: 39
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Newspaper (Atlanta Journal Constitution) Investigation of CDC Biocontainment Door (Select Agents), n.d.

 File — Box: 7, Folder: 40
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.