CSU President, Dr. Larry Penley Resigns, November, 2008, 2008

 File — Box: 7, Folder: 11
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Section 1.11, Phase 1 SFO, Security for Contractor Personnel During Construction, n.d.

 File — Box: 7, Folder: 12
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Judy Schmidt No Longer for CSU Legal Counsel’s Office, 11/13/08, 2008

 File — Box: 7, Folder: 13
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Should SFO Drafts Be Provided to Ron Baker of CSU, n.d.

 File — Box: 7, Folder: 14
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Gordon Gathright Comments on Draft SFO Drawings, 10/21/2008, 2008

 File — Box: 7, Folder: 15
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

GSA May Submit WDRB for U.S. Economy Stimulus Package Construction - $38M – Failed, n.d.

 File — Box: 7, Folder: 16
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Phase I SRO, n.d.

 File — Box: 7, Folder: 17
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Possibility of a Joint Structure for ARS (Blue Tongue) – Stimulus Pkg., Feb. 2009, 2009

 File — Box: 7, Folder: 18
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

Liz Yo Leaves OZ Feb. 25, 2009, 2009

 File — Box: 7, Folder: 19
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2009

OZ SFO Draft 10/27/2008, 11/10/2008, 2008

 File — Box: 7, Folder: 20
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008