CSU Police Services Issue in WDRB and NWRC Ground Leases, Folder 3, 12/5/07-3/26/2008 (1 of 2), 2007 - 2008

 File — Box: 7, Folder: 1
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007 - 2008

CSU Police Services Issue in WDRB and NWRC Ground Leases, Folder 3, 12/5/07-3/26/2008 (2 of 2), 2007 - 2008

 File — Box: 7, Folder: 2
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007 - 2008

Roofing Materials, n.d.

 File — Box: 7, Folder: 3
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Redesign – Initial Cumming Construction Estimate 8/4/08 Revised 8/13/08, 2008

 File — Box: 7, Folder: 4
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Redundant Exhaust Fans, n.d.

 File — Box: 7, Folder: 5
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Will Replace Siemens Phone System for VOIP, n.d.

 File — Box: 7, Folder: 6
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

CSU/ARS Visit to NWRC (ABADRL- Arthropod Borne Animal Disease Research Lab), n.d.

 File — Box: 7, Folder: 7
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Site Layout, n.d.

 File — Box: 7, Folder: 8
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

OZ Redesign Floor Plans – 10/1/08 – 10/21/08, 2008

 File — Box: 7, Folder: 9
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2008

Review of Lab and Animal Elevations and Equipment Schedule, n.d.

 File — Box: 7, Folder: 10
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.