Box 6
Contains 61 Results:
Oxford Query – Need Soils/Geotechnical Reports for the Site, October 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Oxford Site Visit, Tom Fyffe, Hensel Phelps,, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
GSA Proposal to Pay OZ Out of WDRB RWA for Ongoing Consultation, October 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Pre-Bid Conference For Oxford Development, 10/10/07, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Oxford Request to Use TEC as Their Civil Consultant,, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Article 12/23/07 Express Neighbor’s Concern for CDC and CSU BSL-3 Buildings, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Hensel Phelps Wins Contractor Award for CSU RBL Work, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Oxford Query – May We Talk Directly with OZ Architects? October 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
USAHA Resolution 32, October 2007, $3.5M/Year for WDRB Staffing and Operation, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Concerns About Accidents and Liability in Biosafety Facilities, Keenan, Oct. 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.