Box 6
Contains 61 Results:
FY2004 $300K from APHIS B&F For 30% Design, into GSA RWA, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Potential $200K for Scope and Pricing Security System in GSA RWA, FY2006, Cancelled by Ken Miller, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Future Purchase by APHIS, USAHA Resolution, Purchase Price of WDRB, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
CSU to Begin Construction of New Atmospheric Sciences Building, March 2008 (CMMAP), 2008
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Drawings and Sketches Used During Oxford Negotiations, Winter-Spring 2008, 2008
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
BAFO from Oxford 5/23/08 (Exceeds Prospectus Level), 2008
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Dan McPherson Requests “Best and Final” Offer from Oxford, April 2008, 4-2-2008 to 4-22-2008, 2008
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Two Sinks in Animal Suites – Are They Needed? 2/8/08, 2008
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
G. Gathright Change to Hand Sanitizers, 2/11/08, 2008
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Description of Oxford “FFE” Bid and Equipment/Other Items Eliminated by Downsizing, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.