Box 6
Contains 61 Results:
Pre-Bid Conference For Oxford Development, 10/10/07, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Oxford Request to Use TEC as Their Civil Consultant,, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Article 12/23/07 Express Neighbor’s Concern for CDC and CSU BSL-3 Buildings, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Hensel Phelps Wins Contractor Award for CSU RBL Work, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Oxford Query – May We Talk Directly with OZ Architects? October 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
USAHA Resolution 32, October 2007, $3.5M/Year for WDRB Staffing and Operation, n.d.
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Concerns About Accidents and Liability in Biosafety Facilities, Keenan, Oct. 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
KDA Pre-Bid Concerns About Providing Full Service Operation, October 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
Architect’s Rendering, October 2007, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.
SFO 100% Draft, Security (16727) and Door Hardware (08700), and NWRC Comments 8/23/07, 2007
This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.