Skip to main content

Box 5

 Container

Contains 74 Results:

Security Clearance Procedures Section of SFO, n.d.

 File — Box: 5, Folder: 1
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Security Device Locations (Keycard & Pin Readers, Cameras, IR & Glass Break Detectors, etc.), n.d.

 File — Box: 5, Folder: 2
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Room Name Database/Spreadsheet, n.d.

 File — Box: 5, Folder: 3
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

VOIP Phone System Specifications, Section 16741, n.d.

 File — Box: 5, Folder: 4
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Data System Specifications, Section 16741, n.d.

 File — Box: 5, Folder: 5
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Revisions to Landscaping and Addition of Observation Platform 4/26/07, 2007

 File — Box: 5, Folder: 6
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Add Paper Towel Dispensers, Waste Containers, and Soap Dispensers, n.d.

 File — Box: 5, Folder: 7
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Jeanne Fair- Los Alamos Animal Care facility Consultation – 6/25/07 – BSL-3, 2007

 File — Box: 5, Folder: 8
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

SFO Phase Two Items, n.d.

 File — Box: 5, Folder: 9
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Dedication Plaque, n.d.

 File — Box: 5, Folder: 10
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.