NWRC Comments on GSA Sections 1-8 of SFO (2 of 2), n.d.

 File — Box: 4, Folder: 8
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Comments on SFO Sections 9 and 10, n.d.

 File — Box: 4, Folder: 9
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

SFO Division 8, Lease Security Standards, n.d.

 File — Box: 4, Folder: 11
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Contractor Use of NWRC Temporary Auto and Man, n.d.

 File — Box: 4, Folder: 13
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Comment on Specification for Climacool Modular Chillers 3/07, 2007

 File — Box: 4, Folder: 14
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

Permanent Fencing Around the WDRB Site 3/07, 2007

 File — Box: 4, Folder: 16
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

How to Cool the Three Lab Equipment Rooms If They Contain Four Ultracold Freezers, n.d.

 File — Box: 4, Folder: 17
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

GSA Pre-Solicitation Notice in Fedbizops 2/27/07, 2007

 File — Box: 4, Folder: 18
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

SFO Clause on “Unique Developer Opportunity and Attendant Responsibility”, n.d.

 File — Box: 4, Folder: 19
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Question on Air Lock at First Floor East Stairwell Exiting from Biocontainment, n.d.

 File — Box: 4, Folder: 21
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.