Box 3

 Container

Contains 59 Results:

Larry Clark Suggestion 10/6/06 to Rework Showers and Add Lab Or Animal Space, 2006

 File — Box: 3, Folder: 41
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2006

Variety of Animals to House (Feral Pigs, Goats, Etc.), n.d.

 File — Box: 3, Folder: 42
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Lab Equipment Lists, n.d.

 File — Box: 3, Folder: 43
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

SFO Language Related to Existing Utilities, n.d.

 File — Box: 3, Folder: 44
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Meeting Minutes, 30% Design 8/9/06 – 11/17/06, 2006

 File — Box: 3, Folder: 45
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2006

Vivarium Management System (VMS) - Watchdog, n.d.

 File — Box: 3, Folder: 46
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

EA- Extra Printed Copies for Distribution (2 Copies), n.d.

 File — Box: 3, Folder: 47
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Redi-Rock Retaining Walls from Signature Stone, n.d.

 File — Box: 3, Folder: 48
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

New MRP (&APHIS) Directive on Changes to Space & Lease of Field Offices and Facilities MPP 1620. 1,2006, 2006

 File — Box: 3, Folder: 49
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2006

30% Design Kick-Off Meeting, n.d.

 File — Box: 3, Folder: 50
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.