90% Submittal, Drawings, n.d.

 File — Box: 3, Folder: 4
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Can Guard Services Be Included in the Rent?, n.d.

 File — Box: 3, Folder: 5
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Access to North ARB SNE Room Will Be Restricted in the Future, n.d.

 File — Box: 3, Folder: 6
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

FY07 and FY08 GSA Prospectus Level, n.d.

 File — Box: 3, Folder: 7
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

GSA Requirement for “Leed” Certification, n.d.

 File — Box: 3, Folder: 8
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Create a Separate Interstitial Security Room, n.d.

 File — Box: 3, Folder: 9
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Add Poster Display Panels, n.d.

 File — Box: 3, Folder: 10
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

APHIS (Kevin Shea) Signs Waiver to Guarantee $3.5M/YR WDRB Rent Payment 4/9/07 USDA Exemption Granted 4/11/07, 2007

 File — Box: 3, Folder: 11
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007

USDA Requests Meeting APHIS to Discuss WDRB & Rent, Waiver Approved (1 of 2), n.d.

 File — Box: 3, Folder: 12
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

USDA Requests Meeting APHIS to Discuss WDRB & Rent, Waiver Approved (2 of 2), n.d.

 File — Box: 3, Folder: 13
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.