Skip to main content

Box 2

 Container

Contains 65 Results:

Preliminary Final EA for Comment (1 of 2), n.d.

 File — Box: 2, Folder: 31
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Preliminary Final EA for Comment (2 of 2), n.d.

 File — Box: 2, Folder: 32
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

OZ Needs OPP CAD Files for Water Line East of ARB, n.d.

 File — Box: 2, Folder: 33
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

OZ Request for ISRB CAD Files, HC1, U1, G1 from Northern Engineering, n.d.

 File — Box: 2, Folder: 34
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

L. Clark Suggestion to Increase Office Space, n.d.

 File — Box: 2, Folder: 35
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Economic Assessment (Implan) by R. Sterner, S. Shwiff for EA, n.d.

 File — Box: 2, Folder: 36
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Copies of EA for Final Public Comment (Includes Electronic Copy on Drive), n.d.

 File — Box: 2, Folder: 37
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

GAO Audit of BSL-3 and BSL-4 Facilities in USDA et. al., n.d.

 File — Box: 2, Folder: 38
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

POR (Spare Copy), n.d.

 File — Box: 2, Folder: 39
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

BMBL Rewrite; CDC Wants APHIS Participation, n.d.

 File — Box: 2, Folder: 40
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.