 Container

Contains 65 Results:

Interim EPA Guidelines for CWD Carcass Disposal in Landfills, n.d.

 File — Box: 2, Folder: 46
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Floor Plan of CSU BSL-3 Building, n.d.

 File — Box: 2, Folder: 47
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Decision to Keep Design Within GSA Prospectus Level, 1/18/04, 2004

 File — Box: 2, Folder: 48
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2004

NWRC Conf. Call for GSA to Officially Start WDRB Project, 1/7/2004, 2004

 File — Box: 2, Folder: 49
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2004

ARS Construction Manual 7/24/02 – Includes BSL-3, 2002

 File — Box: 2, Folder: 50
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2002

Toni Taylor of APHIS is Gareth Diedrick’s Representative, 2/21/03, 2003

 File — Box: 2, Folder: 51
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2003

Presentation and Approval by APHIS Administrator B. Acord, 2403 (Also R. DeHaven)

 File — Box: 2, Folder: 52
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2007 - 2009

Paraformaldehyde Decontamination for Galvanized Steel Ductwork, n.d.

 File — Box: 2, Folder: 53
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Publication, Security for Labs Working for “select Agents”, n.d.

 File — Box: 2, Folder: 54
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

NWRC Pathogen & Security Inventory, 4/14/03, 2003

 File — Box: 2, Folder: 55
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2003