Environmental Assessment (EA) #2: 4/23/05-11/01/05, 2005

 File — Box: 1, Folder: 41
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2005

EA Scoping Meeting (Public Open House) Oct 12, 2005 (1 of 2), 2005

 File — Box: 1, Folder: 42
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2005

EA Scoping Meeting (Public Open House) Oct 12, 2005 (2 of 2), 2005

 File — Box: 1, Folder: 43
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2005

Mobile BSL-3 Lab at Hilton Hotel Dec 16, 2005, 2005

 File — Box: 1, Folder: 44
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2005

Ron Baker Hired to Represent CSU, n.d.

 File — Box: 1, Folder: 45
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

POR Comments From Tom Bunn – VS/AMES, n.d.

 File — Box: 1, Folder: 46
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Wildlife Disease Lab Network/Lab Surge Space, n.d.

 File — Box: 1, Folder: 47
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.