Skip to main content

Box 1

 Container

Contains 47 Results:

Workshop on Design & Use Of BSL-3 Facilities in APHIS, 11/5-6/03, Beltsville, MD, 2003

 File — Box: 1, Folder: 15
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2003

WS NEPA Group, G. Littauer, K. Wagner, C. Bens, n.d.

 File — Box: 1, Folder: 17
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Design & Maintenance of a Surgical Suite - Lab Animal Articles, June 2004, 2004

 File — Box: 1, Folder: 19
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2004

Visitors 9/29/04 – Hank Gardner (CSU), Curt Mann (Homeland Security), Brian Noland (Norad), 2004

 File — Box: 1, Folder: 20
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2004

17 Pictures of NWRC ARB BSL-3 Lab & Suite, n.d.

 File — Box: 1, Folder: 21
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Upgrading an ABSL2 Facility to ABSL3 (Lab Animal Article), n.d.

 File — Box: 1, Folder: 22
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

OZ Program of Requirements (POR) Proposal, n.d.

 File — Box: 1, Folder: 25
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Mike Dunbar’s Comments on Final POR, 3/16/05, 2005

 File — Box: 1, Folder: 26
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: 2005

Programming Kick-Off Meeting for OZ, n.d.

 File — Box: 1, Folder: 27
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.

Programming Questionnaires, n.d.

 File — Box: 1, Folder: 30
Scope and Contents From the Series:

This series documents the early development process of the Wildlife Disease Research Building up to the point where the redesign began. It is a total of 12.7 Linear Feet. Includes correspondence, pre-construction floor plans and revisions, and design team meeting details.

Dates: n.d.