Leo Daly Cost Estimates Sept 97, n.d.
Scope and Contents
The Pre-Planning and Preparation series was received from Bill Dusenberry in 2001. It contains documents from 1994-2000 and contains all the pre-construction planning and research that occurred before the Outdoor Pens and associated buildings could be built. Includes cost estimates, architectural sketches, reviews, assessments, and email correspondences.
Dates
- n.d.
Extent
From the Collection: 21.6 linear feet (53 Boxes OV folders not included in extent)
Language of Materials
From the Collection: English
Repository Details
Part of the National Wildlife Research Center Archives Repository